Історія


History of DNIPROSPETSSTAL

Each year, since the date of DNIPROSPETSSTAL’s foundation, has been marked with events significant not only for our Company, but for the whole metallurgical industry as well.
1932 the first heat – DNIPROSPETSSTAL’s Foundation Day
1933 bearing steel production was set up
1934 production of stainless acid-resisting chromium-nickel steel was mastered
1941 the works evacuation for the World War II period
1945-1953 the works’ performance restoration after the World War II
1948 the first post-war heat
1955 ladle degassing was practiced  
1956 heat-resistant alloys production was set up
1957 cold-drawn steel production was mastered
1958 electric-slag remelting process was set up for the first time ever in the world
1959 steel and alloy melting in the vacuum-arc furnaces was mastered
1966 the biggest in Europe, at that time, specialized shop for ESR and VAR ingots melting was built
1972 manufacture of large capacity forgings in the forge-press shop was mastered
1980 manufacture of tool and high-speed steel using PM-method was mastered 
1987 gas-oxygen refining process was implemented 
1996 Danieli ladle-furnace was put into operation, and a modern technology of structural and bearing steel manufacture was set up  
1996 quality system according to ISO 9002:1994 was implemented and certified 
1998 Mannesmann-Demag vacuum degasser was put into operation, and a Secondary metallurgy technology was set up  
2002 metal surface finishing shop was put into operation 
2002 quality system according to ISO 9001:2000 was implemented and certified 
2003 ladle-furnace was put into operation in the Steel melting shop No.2, and resource saving technology of corrosion-resistant steel production was implemented 
2006 drop-hammer plant was equipped with a scrap shear press unit 
2007 slag processing shop was built 
2008 quality system according to ISO 9001:2008 was implemented and certified 
2009 Loeser RPS 377 line for 120-280 rolled stock finishing was put into operation at the finishing roll line area of the rolling mill 
2012 CVS Makina 1200 thousand cubic meters/hour Gas Treatment Station was put into operation in the Steel melting shop No.3 
2012 ferromolybdenum manufacture area was put into operation in the Steel melting shop No.2 
2015 the oxygen storage facility of PrJSC “Linde Gas Ukraine” was built 
2017 quality management system (QMS) was certified as compliant for the risk-oriented international standard ISO 9001: 2015. 
2020, 2023 successful re-certification of the quality management system (QMS) and confirmation of compliance with ISO 9001:2015
2023 advancing CBAM compliance